LoginRegister Search
Subject: 2.8 TGV engine install Phase 1

You are not authorized to post a reply.   
AuthorMessages
Peter Carey



12/12/2006 8:36 PM Alert 
Here are some pictures from the install process back a couple weeks.  Sorry it took a while to get the pictures up.

Engine Install Phase 1

Thanks again to all that attended.  I hope I wasn't too much of a job pusher and I think everyone had a good time.   Was the goal accomplished?  not 100%.  Does that really matter?  no.  We got a lot of work done I couldn't have done myself and I appreciate it.

Thanks to Chris for taking the camera and getting some shots while I was preoccupied.

The Carey Adventures
Chris Rollins



12/14/2006 1:00 PM Alert 
I had a heck of a time Peter, whens the next go round?
Peter Carey



12/14/2006 2:30 PM Alert 
Waiting on for sures from Dan and Isaac. I'd like to pick Jan 12/13.

Here's the list of stuff to do, more or less
Left to do before engine starts:
- Attach torque converter bolts
- Install transfer case and mounts
- Attach fuel lines to pump and return nozzle
- Relocate powersteering pump and attach hoses
- Afix fuel filter to body
- Attach coolant resevoir to body
- Figure out wiring and hook up needed things
- Purchase new gauges for boost and exhaust temp
- Install EGT and boost gauges
- Reattach bumper
- Drill out old bolts and reattach winch
- Hook up air hoses
- Hook up cooling hoses
- Install batteries
- Install Hellroaring isolator(s)
- Install radiator
- Install AC cooling stuff
- Install transmission cooler
- Remove old AC pulley and install new one
- Router shifter calbe properly
- Top off transission and transfer fluids

Left to do before 'done':
- Install grill
- Inflate tires
- Check fluids
- Attach parking break
- Attach drive shafts
- Insulate flooring
- Reattach carpet inside
- Attach transfer case shifter works
- Pretty up shifterness
- Insulate hood
- Attach hood
- Tighten up snorkel
- Wire all warning lights properly
- Buy new tabs

The Carey Adventures
Peter Carey



12/14/2006 3:15 PM Alert 
Ok, it's officially the 5th and 6th of January. letme know if you want to make it

The Carey Adventures
Chris Rollins



12/14/2006 3:28 PM Alert 
count me in
Andy Berglund



12/14/2006 3:36 PM Alert 
pics came out good. the best one is with everyone standing around staring at whatever's on the floor

I am loving the Gilmore Girls-Scott Williams
Dan Cronin
Moderator


12/18/2006 10:13 AM Alert 
Gas tank

Honey Badger Trainer...
Peter Carey



12/18/2006 11:51 AM Alert 

Which is now properly labeled a *fuel* tank.

gas, gas, yicky, yicky


The Carey Adventures
You are not authorized to post a reply.
Forums > Vehicles > Tech > 2.8 TGV engine install Phase 1



ActiveForums 3.6
Copyright (C) 2010 Northwest Overland Society, LLC   Terms Of Use  Privacy Statement