Login
Register
Web
Site
Search
Home
Discussions
General
General
Classifieds
Vendor Classifieds
Travel
Vehicles
Tech
Projects
Tech Articles
Skills & Gear
Camping
First Aid
Navigation
Communications
Camp Cooking
Photos
Trips and Activities
Member Vehicles
Blogs
Most Recent
Truck Build-up
Trip Reports
How To
Product Reviews
Reference Tables
Links
Accessory Manufacturers
Accessory Retailers
Camping Gear
Clubs
Dealers
Driving
Navigation
PNW Information
Repair/Restoration Shops
Web Forums
Tread Lightly!
Store
About
FAQs
NW Overland Society
Annual Awards
2006
2007
2008
2009
Current Sponsors
Columbia Rovers
JpFreek
Overland Journal
Overland Navigator
Rover Tech Industries
Unanswered
Active Topics
Forums
Search
Forums
>
Vehicles
>
Tech
Subject: 2.8 TGV engine install Phase 1
You are not authorized to post a reply.
Author
Messages
Oldest First
Newest First
Peter Carey
12/12/2006 8:36 PM
Alert
Here are some pictures from the install process back a couple weeks. Sorry it took a while to get the pictures up.
Engine Install Phase 1
Thanks again to all that attended. I hope I wasn't too much of a job pusher and I think everyone had a good time. Was the goal accomplished? not 100%. Does that really matter? no. We got a lot of work done I couldn't have done myself and I appreciate it.
Thanks to Chris for taking the camera and getting some shots while I was preoccupied.
Chris Rollins
12/14/2006 1:00 PM
Alert
I had a heck of a time Peter, whens the next go round?
Peter Carey
12/14/2006 2:30 PM
Alert
Waiting on for sures from Dan and Isaac. I'd like to pick Jan 12/13.
Here's the list of stuff to do, more or less
Left to do before engine starts:
- Attach torque converter bolts
- Install transfer case and mounts
- Attach fuel lines to pump and return nozzle
- Relocate powersteering pump and attach hoses
- Afix fuel filter to body
- Attach coolant resevoir to body
- Figure out wiring and hook up needed things
- Purchase new gauges for boost and exhaust temp
- Install EGT and boost gauges
- Reattach bumper
- Drill out old bolts and reattach winch
- Hook up air hoses
- Hook up cooling hoses
- Install batteries
- Install Hellroaring isolator(s)
- Install radiator
- Install AC cooling stuff
- Install transmission cooler
- Remove old AC pulley and install new one
- Router shifter calbe properly
- Top off transission and transfer fluids
Left to do before 'done':
- Install grill
- Inflate tires
- Check fluids
- Attach parking break
- Attach drive shafts
- Insulate flooring
- Reattach carpet inside
- Attach transfer case shifter works
- Pretty up shifterness
- Insulate hood
- Attach hood
- Tighten up snorkel
- Wire all warning lights properly
- Buy new tabs
Peter Carey
12/14/2006 3:15 PM
Alert
Ok, it's officially the 5th and 6th of January. letme know if you want to make it
Chris Rollins
12/14/2006 3:28 PM
Alert
count me in
Andy Berglund
12/14/2006 3:36 PM
Alert
pics came out good. the best one is with everyone standing around staring at whatever's on the floor
I am loving the Gilmore Girls-Scott Williams
Dan Cronin
Moderator
12/18/2006 10:13 AM
Alert
Gas tank
Honey Badger Trainer...
Peter Carey
12/18/2006 11:51 AM
Alert
Which is now properly labeled a *fuel* tank.
gas, gas, yicky, yicky
You are not authorized to post a reply.
Forums
>
Vehicles
>
Tech
> 2.8 TGV engine install Phase 1
ActiveForums 3.6
Copyright (C) 2010 Northwest Overland Society, LLC
Terms Of Use
Privacy Statement